Supercharge worksite productivity with Sitemetric AI.
Learn more
HOSPITAL TOWER CUSTOMER STORY

How Sitemetric gave a hospital tower on an active medical campus one live headcount at up to 1,136 workers a day

Turnstiles, an on-site access control officer and crew-wide texts for a hospital tower build with more than 5,400 workers.

Get Started

Project summary

3.9M+
On-site hours
1,200+
Active days
140+
Contractors and subcontractors
5,400+
Workers
500,000+
Worker-days
400+
Daily average workers
THE CHALLENGE

A hospital tower built in the city, next to hospital buildings that stayed open.

A general contractor team built a new hospital tower on an active hospital campus, with hospital visitors and pedestrians passing close to the construction zone. Daily headcount passed 500 on 497 days and 1,000 on 102 days, and peaked at 1,136 workers from 71 companies across separate work areas of the site.

The contractor needed to:

  • Keep hospital visitors and the public out of the construction zone
  • Get more than 1,000 workers through the gates on peak days
  • Alert crews across separate work areas to weather, road closures and blocked walkways
  • Keep a live headcount across 140+ contractors and subcontractors
THE SOLUTION

Integrated Construction Intelligence

The contractor chose Sitemetric as one partner for access control and workforce visibility. Turnstiles at multiple gates controlled entry and exit. A Sitemetric access control officer on site kept badging simple: checking that the turnstiles were working and clearing used and lost badges so they could be reissued. The team used Sitemetric mass texting to send crews weather alerts, road closures and blocked walkway notices.

  • Turnstile entry and exit at multiple gates
  • Sitemetric access control officer on site
  • Mass texting for weather, road and walkway alerts
  • Real-time headcounts by gate and company
Sitemetric app interface preview for a hospital tower construction site

“The tower went up in the middle of the city. With hospital visitors and pedestrians walking by, the turnstiles did a lot of the work of keeping the public out of the construction zone.”

Regional Leader, Site Operations

Sitemetric

THE RESULT

One live headcount through the busiest stretch of the hospital tower build.

Over more than 1,200 active days, the project logged more than 3.9 million on-site hours.

1,000+ WORKERS ON 102 DAYS

On 102 days, more than 1,000 workers were on site, and on 497 days, more than 500.

SHIFT START AT THE TURNSTILES

More than half of turnstile entries were logged between 5 and 7 a.m., and the headcount updated as crews came through.

NEARLY 400 TEXTS TO THE CREWS

The team sent nearly 400 texts on more than 250 days, covering lightning stand-downs, heat and winter weather, closed floors and stairways, and road and walkway closures. Each reached about 1,900 people on average.

The job moves fast.
Your tech should too.

Talk with our team about your jobsite needs and learn how Sitemetric can help your project succeed.